March 28th 2023 OPERATION STATUS
Daily power delivered (MWh):8267
Monthly power total delivered (MWh):239960
Monthly power delivered of Phase I (MWh):14747
Monthly power delivered of Phase II (MWh):225213
Running units:GT7/ST8/GT9/ST10
Total delivered load (MW):353
Nigeria natural gas supply (mmscf):75.58
Takoradi natural gas supply (mmscf):0
Tema gas station inlet pressure (Mpa):3.97
Sunon asogli gas station inlet pressure(Mpa):3.53
Tema gas consumption(mmscf):85.22
Sunon asogli gas consumption (mmscf):57.6
…